Supply-Only vs Delivered vs Installed Unitized Curtain Wall Quotes

Sep 4,2026

Why Quotation Labels Are Not Enough

A unitized curtain wall quotation may be described as supply-only, delivered-to-site, technical support, supervised, or installed. These labels are useful starting points, but they do not by themselves define the complete scope. Two quotations using the same label may still assign packaging, unloading, storage, lifting, installation, adjustment, replacement, inspection, or handover to different parties.

Quotation labelIncluded activitiesExclusions / optionsResponsible partySite assumptionsRecords / status

There are three primary commercial scope models: supply-only or factory collection; delivered-to-site; and installed or supply-and-install. Technical support, design assistance, training, and supervision are a separate service layer. They may be added to any primary model, but they do not automatically equal installation labor.

These are review categories, not automatic legal or contractual allocations. The exact boundary must be stated in the quotation, scope-of-supply schedule, responsibility matrix, project documents, and qualified professional review.

This article helps buyers compare quotation models after receiving supplier proposals. It does not recommend a universally cheapest, safest, fastest, or best model. It does not teach Incoterms, customs, tax, insurance, engineering responsibility, BIM, shop drawings, full installation methods, or multi-bid leveling.

Direct Answer: What Are the Main Quotation Scope Models?

01

Supply-only / factory collection

This may focus on unitized panels, specified materials, and defined factory activities. State whether it stops at factory release, loading, collection, or another named point. Packaging, transport, unloading, storage, lifting, installation, replacement, records, and handover must be identified separately.

02

Delivered-to-site

This may cover transport to a stated endpoint. It does not automatically include unloading, receiving inspection, storage, weather protection, movement to an installation floor, lifting, installation, replacement, or handover.

03

Installed / supply-and-install

This may combine product supply, factory work, delivery, site handling, lifting, installation labor, supervision, adjustment, replacement, inspection, and handover. Still require a line-item scope and exclusions.

+

Technical support / supervision

Advice, coordination, training, site visits, observation, supervision, or design assistance are separate activities. They do not automatically equal installation labor.

Controlled drawings and planning documents used to compare unitized curtain wall quotation scope
Compare quotation models against the same controlled activity list, responsibility matrix, site assumptions, and document requirements.

Supply-Only, Ex-Works, or Factory-Collection Scope

A supply-only quote should state exactly what the supplier will provide and where its stated activities stop. Ask whether the scope includes:

  • unitized panels and specified materials;
  • factory assembly, glazing, sealing, inspection, and labeling;
  • factory-release status and release records;
  • packaging, loading, and collection readiness;
  • collection from the factory, terminal, or another named point;
  • transport arrangement or carrier appointment;
  • damage or shortage records after release or collection;
  • replacement units, re-delivery, or reinstallation; and
  • product records, manuals, training, or handover documents.

Do not infer that supply-only includes packaging, loading, transport, unloading, storage, lifting, installation, inspection, replacement, or handover. Do not infer that it excludes them without reading the stated quotation. The relevant question is which activities, documents, and responsibilities are expressly Included, Optional, Excluded, Subject to Confirmation, or an Open Question.

Factory work and release

Where factory work is included, identify assembly, glazing, sealing, dimensional checks, labeling, inspection, rework, storage, and factory-release records as applicable. Factory release is a workflow or project status; it is not automatically site receiving, installation approval, final acceptance, certification, or code compliance.

Packing, loading, and collection

Clarify the package or crate basis, loading responsibility, collection window, collection location, labels, visible-condition records, and point at which the next party assumes handling. Do not add a trade-term or insurance interpretation to the label. Those matters belong in applicable project and commercial documents.

Activities after release

A supply-only quote may leave transport, unloading, storage, lifting, installation, adjustment, replacement, and handover to other parties. Name the expected party or mark the item Subject to Confirmation or Open Question rather than leaving the boundary implicit.

Delivered-to-Site Scope

“Delivered-to-site” should be accompanied by an exact endpoint and post-arrival scope. Possible endpoints include a gate, site entrance, unloading area, warehouse, depot, receiving zone, floor, or another project-defined location. This article does not determine which endpoint applies.

  • appointment and receiving-window coordination;
  • transport to the stated endpoint;
  • unloading labor or equipment;
  • receiving inspection, package count, and visible-damage records;
  • temporary storage and weather protection;
  • movement from the receiving area to the installation zone;
  • lifting equipment, operators, crane, hoist, access equipment, or staging;
  • damage reporting, replacement, and re-delivery; and
  • installation, supervision, adjustment, records, and handover.
Delivered does not mean installed.A delivered-to-site label may describe only a transport endpoint. It does not automatically mean unloaded, stored, lifted, installed, inspected, accepted, or handed over.

The boundary should be connected to site-readiness assumptions, receiving arrangements, and named responsibilities. This article does not teach Incoterms, customs, duties, taxes, insurance, title, or trade-risk allocation. Those subjects belong in applicable delivery and contract documents and should be reviewed by relevant professional teams.

Warehouse handling scene illustrating unloading, receiving, storage, and internal movement responsibilities
Delivery scope should state the endpoint and separately allocate unloading, receiving inspection, storage, internal movement, damage records, and re-delivery.

Technical Support, Design Assistance, Training, and Supervision

Technical support is often used as a broad phrase. Break it into activities before comparing it with an installed quote. Ask whether the supplier offers:

  • technical answers and coordination meetings;
  • product or system information;
  • installation guidance or training;
  • remote support or site visits;
  • observation or supervision of another party’s work;
  • site measurement or condition review;
  • installation labor and tools;
  • site adjustment or rework;
  • inspection records and reports; and
  • handover documentation.

“Supervision” may mean observation, guidance, coordination, management, or another stated activity. It does not automatically mean that the supplier performs installation labor. “Design assistance” is not automatically delegated design. Engineering responsibility, BIM, calculations, and shop-drawing scope should be stated separately.

The quote should state support activities, limits, frequency, deliverables, site presence, exclusions, and responsible party. If support is only advisory, do not treat it as labor, equipment provision, installation, or completed-work responsibility.

Installed or Supply-and-Install Scope

An installed quotation should describe the complete sequence it covers rather than relying on the word “installed.” Ask whether the offer includes:

  • product supply and factory activities;
  • packaging and delivery basis;
  • unloading, receiving, and storage;
  • lifting equipment, operators, access, and staging;
  • installation labor, tools, consumables, and supervision;
  • floor release, substrate readiness, anchors, embeds, and interfaces;
  • installation sequencing and site coordination;
  • site adjustment and interface work;
  • damaged-unit replacement, re-delivery, and reinstallation;
  • installation inspection, records, and reporting;
  • protection or cleaning where required; and
  • handover, manuals, training, and final records.

The installed scope should also state what remains with the main contractor, site team, design team, QA/QC team, carrier, or another specialist. Installed work may still depend on floor release, access, storage, lifting, approved information, receiving conditions, adjacent trades, or site readiness. Record these dependencies as project assumptions rather than silently including them.

Glass facade construction scene illustrating site access, lifting, installation, and adjacent-trade coordination
Installed scope should identify labor, equipment, access, sequencing, interfaces, inspection, replacement, records, and handover—not only the final installation activity.

Scope Model Comparison Matrix

The matrix compares the three primary commercial models. Technical support and supervision remain a separate service column because they are not automatically installation.

Activity or scope fieldSupply-only / factory collectionDelivered-to-siteTechnical support / supervisionInstalled scopeStatus / owner
Panels and specified materialsState products and material limitsState products and material limitsState support basisState supply basis under installation offerFive scope labels
Factory assembly, glazing, sealing, releaseIdentify factory activities and recordsIdentify factory and shipment preparationConfirm document or support roleLink factory scope to installation offerSupplier
Packaging and loadingState package and collection boundaryState packaging and loading basisUsually separate; confirmState package responsibilitySupplier / carrier / project team
Transport to stated pointMay be excluded or arranged separatelyState transport and endpointNot implied by supportState delivery basisCarrier / supplier
Unloading and receivingSeparate unless statedState explicitlyNot implied by supervisionState labor, equipment, receiving scopeCarrier / installer / contractor
Storage and weather protectionSeparate unless statedConfirm after deliveryNot implied by supportState temporary protection and storageSite team / installer
Lifting, crane, hoist, accessSeparate unless statedNot automaticNot installation laborState equipment, operators, access assumptionsInstaller / contractor
Installation laborExcluded unless separately offeredNot automaticSeparate from advice or supervisionState labor, tools, sequencingInstaller
Technical support and trainingOptional or defined supportOptional or defined supportState activities and limitsLink support to installed scopeSupplier / installer
Site adjustment and interfacesSeparate unless statedSeparate unless statedAdvice only unless statedState adjustment and interface workInstaller / contractor
Damage, replacement, re-deliveryState boundary after releaseState delivery and site-handling boundarySupport only unless statedState replacement and re-delivery processParties to assign
Inspection, records, handoverState factory and supply recordsState delivery recordsState support or supervision recordsState installation, inspection, handover recordsProject team

This matrix is a disclosure and clarification tool, not a universal allocation or contract interpretation.

Responsibility Matrix: Who Owns Each Activity?

Populate this structure from the actual quotation, scope schedule, responsibility register, project documents, and qualified professional review. In this example, Open is an illustrative project workflow status only; it is not a quotation-scope label.

ActivitySupplier / manufacturerCarrier / logistics providerInstallerMain contractor / site teamProject design / QA/QC teamStatus / open item
Product and factory scopeState supply, factory work, release records——Confirm interfaceConfirm review basisOpen
Packing and shipment preparationState packaging and loadingState transport handling—Confirm receiving conditions—Open
Transport and delivery pointState offered basisState transport activities—Confirm access and receiving—Open
Unloading and storageState any supportState equipment or handling limitState if includedState site and storage provision—Open
Lifting and installationState support or included workState carrier limitsState labor and equipmentState access and floor release—Open
Adjustment and interfacesState technical clarification—State site workState adjacent-trade coordinationState design reviewOpen
Replacement and re-deliveryState replacement processState damage or re-delivery roleState installation/replacement roleState notice, storage, accessState reviewOpen
Inspection and handoverState recordsState delivery and damage recordsState installation recordsState receiving and coordinationState review or acceptance basisOpen

Do not populate responsibility fields from a quotation label alone. Scope allocation needs written confirmation.

Site-Activity Scope Questions

Unloading and receiving

  • What exact endpoint is stated?
  • Who supplies labor and equipment for unloading?
  • Who checks package count, labels, visible damage, and receiving condition?
  • What receiving window, access route, and site-readiness conditions are assumed?
  • Who records damage, shortage, or delivery exceptions?

Storage and protection

  • Who provides temporary storage, weather protection, security, and movement control?
  • How long is storage assumed if the site is not ready?
  • Who moves units to the installation area?
  • Who protects panels, glass, finishes, and labels?

Lifting and access

  • Who provides cranes, hoists, lifting devices, operators, rigging, access, and staging?
  • What floor release, access, loading, edge-protection, and coordination assumptions apply?
  • Are lifting and installation included together?
  • Who handles a unit that cannot be lifted or installed under stated conditions?

Installation and adjustment

  • Who provides labor, tools, consumables, and supervision?
  • Are site adjustments, interface coordination, and rework included?
  • Who controls sequencing and records completed work?
  • What is included for replacement, re-delivery, and reinstallation?

Records and handover

  • Which factory, delivery, receiving, installation, inspection, and replacement records are included?
  • Who compiles the handover index, manuals, training, and final documents?
  • Does the quote include site-acceptance support or only supply and delivery records?
  • Which items remain Subject to Confirmation or Open Question?

Scope and Workflow Statuses Must Stay Separate

Quotation scope states

IncludedOptionalExcludedSubject to ConfirmationOpen Question

Workflow and project states

OpenSubmitted / Returned / Revised / ReviewedFactory ReleaseSite ReceivingFinal AcceptanceTo be confirmed / Professional review / Responsibility to assign

“Factory Release,” “Site Receiving,” and “Final Acceptance” are separate project statuses. None should be inferred from a scope label.

FAQ: Supply, Delivery, and Installation Scope

What is included in a supply-only unitized curtain wall quote?

A supply-only quote may focus on panels, materials, and defined factory work, but the exact boundary must be stated. Ask whether factory assembly, glazing, sealing, inspection, release, packaging, loading, collection, records, replacement, and handover are included, optional, excluded, or subject to confirmation.

Does delivered-to-site include unloading and storage?

Not automatically. Confirm the exact delivery endpoint and whether unloading labor or equipment, receiving inspection, storage, weather protection, movement to the installation area, and site handling are included.

Is technical support the same as curtain wall installation?

No universal equivalence should be assumed. Separate advice, coordination, training, site visits, supervision, installation labor, tools, adjustment, records, and handover in the quotation.

Who provides lifting equipment for unitized curtain wall panels?

The quotation and responsibility matrix should name the party responsible for cranes, hoists, lifting devices, operators, rigging, access equipment, staging, floor release, and site coordination. Do not infer the answer from “delivered” or “installed.”

What should an installed curtain wall quotation include?

It should state product supply, factory work, delivery, unloading, storage, lifting, installation labor, tools, supervision, site adjustment, replacement, inspection, records, and handover. Also confirm dependencies such as access, floor release, substrate readiness, and adjacent-trade coordination.

Who is responsible for site adjustment and replacement units?

Name the responsible party for adjustment, damage reporting, storage, replacement request, re-delivery, reinstallation, records, and review. The answer depends on the quotation, scope schedule, responsibility matrix, and project documents.

What should a unitized curtain wall responsibility matrix show?

It should map supplier, carrier or logistics provider, installer, main contractor or site team, and project design or QA/QC team against factory work, delivery, unloading, storage, lifting, installation, adjustment, replacement, inspection, records, and handover.

Does installed scope automatically include handover and acceptance?

No. Installation, inspection records, manuals, training, final documents, site receiving, project review, and final acceptance should be listed separately with their responsible parties and workflow statuses.

Conclusion and Project-Specific CTA

Supply-only, delivered-to-site, technical-support, and installed unitized curtain wall quotes should be compared by activities and responsible parties, not by labels alone.

  1. Identify the quotation model. State whether the offer is supply-only, delivered-to-site, technical support or supervision, supply-and-install, or another defined model.
  2. List the activities. Separate product supply, factory work, packaging, transport, unloading, storage, lifting, installation, adjustment, replacement, inspection, records, and handover.
  3. Name the parties. Assign supplier, carrier, installer, main contractor or site team, and project design or QA/QC responsibilities.
  4. Record assumptions and statuses. Use the five quotation scope labels and keep them separate from workflow and project statuses.
  5. Confirm the site basis. Record access, floor release, storage, lifting, staging, site readiness, adjacent trades, replacement, records, and handover dependencies.
  6. Obtain project-specific review. Route legal, trade, tax, insurance, design, installation, QA/QC, acceptance, and handover questions to qualified professionals.

Share the quotation, scope-of-supply schedule, delivery basis, site-readiness assumptions, installation requirements, replacement expectations, records, and handover list for a project-specific supply/delivery/installation scope review.

FOWALL’s public pages describe categories such as engineering, manufacturing, delivery planning, installation guidance or supervision, and quality-control processes. Any service availability, scope, fee, technical responsibility, delivery content, installation activity, or project deliverable must be confirmed for the specific project. This article does not select a universally best quotation model and does not provide legal, tax, insurance, engineering, installation, acceptance, or performance conclusions.

Request a project-specific scope review